Details
Reactor Type | High Temperature Gas-Cooled Reactor (or HTGR) |
---|---|
Model | HTR-PM |
Owner | China Huaneng Group |
Operator | Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd. |
Timeline
Construction Start | Sunday, 9 December 2012 |
---|---|
First Criticality | Sunday, 12 September 2021 |
First Grid Connection | Monday, 20 December 2021 |
Commercial Operation | Tuesday, 5 December 2023 |
Specifications
Capacity Net | 150 MWe |
---|---|
Capacity Gross | 211 MWe |
Thermal Capacity | 500 MWt |
Design Net Capacity | 200 MWe |
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2021 | 200 | 432 | 86.40 | - | - | - | - | - |
2022 | - | - | - | - | - | - | - | - |
2023 | 150 | 744 | 112.09 | 100.00 | 100.00 | 100.00 | 100.40 | 100.40 |