Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | VVER V-412 |
Owner | Nuclear Power Corporation Of India Ltd |
Operator | Nuclear Power Corporation Of India Ltd |
Timeline
Construction Start | Sunday, 31 March 2002 |
---|---|
First Criticality | Saturday, 13 July 2013 |
First Grid Connection | Tuesday, 22 October 2013 |
Commercial Operation | Wednesday, 31 December 2014 |
Specifications
Capacity Net | 932 MWe |
---|---|
Capacity Gross | 1000 MWe |
Thermal Capacity | 3000 MWt |
Design Net Capacity | 917 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2013 | 917 | 661 | 0.29 | - | - | - | - | - |
2014 | 917 | 4212 | 2542.23 | - | - | - | - | - |
2015 | 917 | 3993 | 3212.83 | 45.60 | 39.70 | 39.70 | 40.00 | 40.00 |
2016 | 932 | 6828 | 5823.01 | 77.70 | 71.20 | 55.60 | 71.10 | 55.70 |
2017 | 932 | 3937 | 2889.26 | 44.90 | 36.50 | 49.20 | 35.40 | 48.90 |
2018 | 932 | 4997 | 4372.96 | 57.00 | 53.60 | 50.30 | 53.60 | 50.10 |
2019 | 932 | 5349 | 4847.99 | 61.10 | 59.50 | 52.20 | 59.40 | 51.90 |
2020 | 932 | 6369 | 4968.80 | 72.50 | 60.50 | 53.60 | 60.70 | 53.40 |
2021 | 932 | 6982 | 6475.11 | 79.70 | 78.10 | 57.10 | 79.30 | 57.10 |
2022 | 932 | 7228 | 6572.07 | 82.50 | 79.70 | 59.90 | 80.50 | 60.00 |
2023 | 932 | 8141 | 7584.74 | 92.90 | 91.80 | 63.40 | 92.90 | 63.70 |